Williston photos
 
 
Major Developments in Williston
Last updated November 11, 2025. 
Information on this Planning & Zoning page is often updated when the office receives multiple inquiries about the same project or development activity. 
If you feel a certain project should be included or updated, don't hesitate to reach out, 802-878-6704 ext. 3. 

 


 

2300 Saint George Road (TD Bank on Route 2A) 

December 15, 2023 The Zoning Administrator and Project Review Committee reviewed AP 24-0061, an application for a Certificate of Conformity (permit) to build a six-story, 59-unit residential building on Saint George Road east of existing TD Bank building on the site. Architectural Plans Site Plans

 


34 Blair Park Hotel Approved final plans for the hotel at 34 Blair Park Road. 

DP 18-06.1 Approved final Plans Civil

DP 18-06.1 Approved final Plans Architectural 

 


4626 Williston Road (Intersection of Williston Road and Industrial Avenue) 

Final plans approved for the demolition, regrading, and redevelopment of this site for a new car dealership building and site. 

Site Plans

Architectural Plans 

 


Aldi Grocery Store

Discretionary Permit application was approved for Phase 1 of a mixed use development on a 3.3 acre project tract. Phase 1 includes a 19,500sf grocery store and parking lot at the junction of Wright Avenue and Merchants Row and construction of an extension to Wright Avenue. Future phases include a multi-household residential building, urban park and construction of part of Trader Lane.  Located in the Taft Corners Zoning District (TCZD). Since DP 21-20 was approved, the Form-Based Code was adopted and Regulating Plan amended such that the Trader Lane alignment overlaps with future Phase 2. The Administrative Permit for the grocery store was issued on January 7, 2025,  expires after 2 years on January 7, 2027 and can be renewed for a third year to January 7, 2028. 

Architectural Plans

Site Plans

 


The Annex

Final Plans have been approved for Phase 1 of a mixed-unit development involving a 54.2-acre parcel. The project, called “The Annex”, has access points off of Beaudry Lane, Alpine Drive, and Chelsea Place/Dunmore Lane and is located in the Midway Residential Zoning District (MRZD). Phase 1 consists of 16 single-family carriage homes, 20 duplex units, 40 townhome units, and 132 multi-family apartment units (in two buildings).

Phase 2 is not being proposed for approval at this time, but elements are illustrated on some of the uploaded documents to provide context for overall street layout. 

Narrative Cover Letter

The Annex Land Plan

Civil Plan Set - Site Plans and Profiles

Civil Plan Set - Details

Civil Plan Set - Landscaping Lighting Maintenance

Architectural Plans 

 


Chittenden Solid Waste District 

April 23, 2024 The DRB reviewed a Discretionary Permit application for a 68,000 square foot Materials Recovery Facility on Redmond Road. CSWD is abandoning its plan to build a new recycling center on Redmond Road in Williston after a summer walk-through of its 27-acre parcel found newly formed wetlands.

Civil Plans

 


Cottonwood Crossing

Cottonwood Crossing is a mixed-use development under construction on a 16.6 acre parcel located on the south side of Williston Road-Talcott Road intersection and adjacent to Maple Tree Place. Current activity is related to Phase I of the project: a commercial building, a mixed-use building with 28 apartments, a residential building with 18 apartments, and new streets, parking, and related improvements. Phase II recently also received final plan approval and elements of both phases are permitted for construction as of November, 2019. 

Cottonwood Crossing Phase 1 Approved Final Plans 

Cottonwood crossing Phase 2 Approved Final Plans 

Cottonwood Crossing Phase 1 Amendment DP 16-05.1

Cottonwood Crossing Phase 2 Amendment DP 16-05.2

 

 

 


Finney Crossing

Finney Crossing is a mixed-use development nearing construction on lands north of Williston Road (across from Shaw's). The final building in Finney Crossing was completed in October 2025 and is expected to be fully occupied by early 2026. The current approved plans for Finney Crossing may be viewed here: 

Finney Crossing Approved Final Plans

  • February 8, 2024 The Zoning Administrator and Project Review Committee reviewed AP 24-0102, an application for a Certificate of Conformity (permit) to build a four-story, 38-unit residential building on Market Street east of the new 4-stopry hotel. Construction anticipated Summer/Fall 2024. Architectural Rendering Architectural Plans Civil Plans
  • December 15, 2023 The Zoning Administrator and Project Review Committee reviewed AP 24-0071, an application for a Certificate of Conformity (permit) to build a one-story multi-tenant retail building on the south side of Market Street. Construction anticipated Fall 2024. Architectural Plans Civil Plans
  • October 4, 2021 following the issuance of a determination of compliance with zoning on July 27, 2023, a project review Committee Meeting on June 27, 2023, and submission of preliminary plans on April 21, 2023, the Zoning Administrator approved AP 23-0188, a Certificate of Conformity to construct a 4-story 115-room hotel at  the corner of Market Street and Holland Lane. AP 23-0188 Architectural Plans AP 23-0188 Civil Plans
  • July 13, 2021 - The DRB approved pre-application recommendations for DP 09-01.23 (Building H and Urban park) to be Railroad & Main Restaurant (Farmhouse as of Summer 2025) and DP 09-01.24 Building F Senior Living facility on Holland Lane and Market Street. 
     
  • June 8, 2021 - The DRB approved DP 09-01.22, a discretionary permit to construct  Building E a multi-tenant commercial building (approx. 26,000 SF) to include L.L. Bean and other retailers on Lot C-2 (3.08 acres) in Finney Crossing at the corner of Holland Lane and Williston Road. DP09-01.22 Civil Set, Master Sign Plan, and Architectural Set

  • April 13, 2021 - The DRB approved DP 09-01.22 pre-application review for a proposed multi-tenant commercial building (Building E) in Finney Crossing at the corner of Holland Lane and Williston Road in the Taft Corners Zoning District (TCZD) and DP 09-01.21 a Master Sign Plan amendment.

  • December 8, 2020 - The DRB approved DP 09-01-20, amendments to the Finney Crossing Commercial Master Sign Plan 

  • April 28, 2020 - The DRB approved DP 09-01.18 A3 to include two (2) additional studio/one-bedroom dwelling units, a larger trash & recycling building, and public art at 664 Zephyr Road, Finney Crossing in the Taft Corners Zoning District (TCZD). Building A3 is currently under construction. 

  • March 10, 2020 - The DRB authorized DP 09-01.17 pre-application to moved forward to discretionary permit for development of building H containing Folino’s Pizza and Fiddlehead Brew Pub at Finney Crossing in the Taft Corners Zoning District (TCZD). This project is superseded by DP 09-01.23. 

  • June 25, 2019 - The DRB approved a DP 09-01.16 to construct commercial building "Building J" (Healthy Living Market, retail tenants, and restaurant tenant) at Finney Crossing “Building J” on Williston Road at Boxwood Lane intersection, opposite of Shaw's in the Taft Corners Zoning District (TCZD). DP 09-01.16 Final Plans. 

  • January 23, 2018 - The DRB approved DP 09-01.13 to change the unit types in Building A2 located at 280 Holland Lane. The request was to go from 33 two-bedroom units and 32 one-bedroom units (totaling 65 units) to 77 one-bedroom units. However, final plans were not filed and the original 65-unit configuration was constructed. 

  • May 22, 2018 - The DRB approved Union Bank at 31 MArket Street at the corner of Zephyr Road and Williston Road (DP 09-1.14). The 2-story, 9312 SF building with drive-thru lanes and 1,418 SF of professional office space.  Union Bank Final Plans and Elevations
  • November 28, 2017 - The DRB approved a Home2 Suites by Hilton, a 3-story hotel with 100 rooms (DP 09-01.12). This approval also included a reconfiguration of Holland Lane/Market Street intersection within Finney Crossing. Holland Lane will intersect Williston Road/Route 2 at the Boxwood Street signal. The hotel is currently under construction on the western edge of the property, approximately halfway between Seymour Street and Williston Road. Finney Crossing Hotel Final Plans and Elevations
 

Maple Tree Place

Maple Tree Place is an existing commercial development in Taft Corners south of Williston Road that includes Shaw's, Starbuck's, the shops around the "green," the Chili's and Longhorn restaurants, and the building containing Dick's, Staples, and Old Navy. Approvals that control most of Maple Tree Place are over 20 years old, however a Master Sign Plan that still has relevance to the project was approved by the DRB in 2010 and is amended from time to time. 

Maple Tree Place DP 10-35 Master Sign Plan 

 


Northridge 

Northridge is a 40-unit subdivision on a 44.6 acre parcel north of Metcalf Drive and east of Coyote Lane. 

Northridge Approved Final Plans

Northridge Sample Photos of Proposed Structures

 

 


Robear Subdivision 

The DRB approved DP 18-21, a 9-lot subdivision of a 55.78-acre parcel at 4964 Williston Road in the IZDW, on November 13, 2018.  The subdivision created 8 parcels 1-9 acres in size and a 19.89 acre conservation lot. 4 parcels will have curb cuts on Shunpike Road (between 375 Engineers Drive and 253 Shunpike Road) and 2 curb cuts onto Williston Road (across from Munson Way and approx. 4959 Williston Road). See the DRB agendas & minutes page for the most up-to-date information on proposed developments on the newly created parcels. 

  • Lot 3 U-Haul Facility.  On August 25, 2020, The DRB approved DP 20-03, allowing for the development of a U-Haul self-storage facility and rental outlet with several buildings,  parking areas, and other appurtenances at 4964 Williston Road.
  • DP 20-03 U-Haul Final Plans 
  • Lot 2 U-Haul Facility. On August 25, 2023, the DRB approved DP 23-12, allowing for the development of an additional U-Haul facility to the east of and on the same driveway as the existing facility. DP 23-12 U-Haul Final Plans
  • Lot 4 GPA, LLC On December 13, 2022, the DRB reviewed discretionary permit application DP 21-19 for the development of three industrial buildings, parking, and appurtenances on Lot 4. 
  • DP 21-19 GPA, LLC Final Plans
  • Lot 6 Mini-storage. On February 12, 2019 the DRB reviewed discretionary permit application DP 19-06 for the development of a mini-storage facility on Lot 6 (319 Shunpike Road).  
  • Lot 7 Multi-tenant building. On March 12, 2019 the DRB reviewed pre-application request DP 19-18 for the development of an 18,000 SF multi-tenant commercial building on Lot 7 (opposite 358 Shunpike Road, approx.). 
  • DP 18-21 Robear Subdivision Final Plans
  • Lot 8

 


Summer Field 

Summer Field is a 139-unit residential development off Mountain View Road and Raven Circle on lands that were formerly part of the Catamount Country Club Golf Course. Phase 1 infrastructure is under construction as of Spring 2025. 

DP 20-18 Approved Final Plans 

DP 20-18.3 Approved Final Plans Minor Amendment 06-10-2025

 


Townhomes at Sally's Way. 14 new homes and one existing home on a new street connecting Mountain View Road to Meadowrun Road. Under Construction as of Summer 2024 at 230 Mountain View Road.

DP 21-05 Approved Final Plans 

 


Windswept Meadows (Glaser Specific Plan)

Windswept Meadows is a 107- home residential development on 94.7 acres at the corner of Mountain View Road and Old Stage Road. The subdivision is the development component of a Specific Plan approved by the Selectboard called the Glaser Specific Plan. As part of the Specific Plan approval, 48.4 of the 94.7 acre parcel will be conveyed to the Town as open space, with 15 of the open space acres at the corner of Mountain View and old Stage Road protecting the views of Camels Hump from mountain View Road and available for the Town to develop a public park. the remaining 33.4 acres of protected open space, currently in use as horse pasture by Windswept Farm, are intended to be owned by the Town and to continue to be used for horse pasture. 

DP 24-06 Final Plans

 

 

Attached Document or FileDP_09-21_Signed_Final_Plans_Architectural_Plan_Aug_26_2015.pdf  
Attached Document or FileDP_09-21_Signed_Final_Plans_Housing_Development_Aug_26_2015.pdf  
Attached Document or FileDP_09-21_Signed_Final_Plans_Landscape_Plan_Aug_26_2015.pdf  
Attached Document or FileDP_09-21_Signed_Final_Plans_Lighting_Plan_Aug_26_2015.pdf  
Attached Document or FileDP_09-21_Signed_Final_Plans_Master_Sign_Plan_Aug_26_2015.pdf  
Attached Document or FileDP_09-21_Signed_Final_Plans_Site_Plan_Aug_26_2015.pdf  
Attached Document or FileDP_17-01_Signed_Final_Plans.pdf  
Attached Document or FileDP_17-01_Photos.pdf  
Attached Document or FileDP_09-01_Amend_12_Signed_Final_Plans_March_5_2018.pdf  
Attached Document or FileDP_09-01_Amend__14_Final_Plans.pdf  
Attached Document or FileDP_16-13_15_Blair_Park_Signed_Final_Plans_Arch_May_23_2017.pdf  
Attached Document or FileDP_16-13_15_Blair_Park_Signed_Final_Plans_Site_May_23_2017.pdf  
Attached Document or FileDP_18-21_Robear_Subdivision_Approved_Final_Plans.pdf  
Attached Document or FileDP_16-05.2_Signed_Final_Plans.pdf  
Attached Document or FileDP_16-05.1_Signed_Final_Plans.pdf  
Attached Document or FileDP_15-02_Creeks_Edge_Signed_Final_Plans_May_3_2017.pdf  
Attached Document or FileDP_09-01_Finney_Crossing_Amend__11_Approved_Final_Plans__Aug_9_2016.pdf  
Attached Document or FileDP_09-01_Amend__14_Final_Plans(1).pdf  
Attached Document or FileDP_09-01.15_Signed_Final_Plans_October_24_2018.pdf  
Attached Document or FileDP_09-01.16_Healthy_Living_Finney_Crossing_Bldg_J_Signed_Final_Plans_October_2_2019(1).pdf  
Attached Document or FileDP_09-01_Amend_10_Final_Plans_Finney_Building_A1_A2_A3_Civil_set_and_plat.pdf  
Attached Document or FileDP_09-01_Amendment_10_Final_Plans_Finney_Building_A1_A2_A3_Architectural.pdf  
Attached Document or FileDP_09_01_Finney_Crossing_Overall_Construction_Phasing_Final_Plans_1_of_4.pdf  
Attached Document or FileDP_09_01_Finney_Crossing_Overall_Construction_Phasing_Final_Plans_2_of_4.pdf  
Attached Document or FileDP_09_01_Finney_Crossing_Overall_Construction_Phasing_Final_Plans_3_of_4.pdf  
Attached Document or FileDP_09_01_Finney_Crossing_Overall_Construction_Phasing_Final_Plans_4_of_4.pdf  
Attached Document or FileDP_09-01_BLA_16-03_September_30_2015.pdf  
Attached Document or FileDP_09-01.16_Healthy_Living_Finney_Crossing_Bldg_J_Signed_Final_Plans_October_2_2019(2).pdf  
Attached Document or FileDP_09-01_Signed_Final_Plans_Finney_Crossing_Phases_2B_3A_3B_4A_January_28_2014.pdf  
Attached Document or FileFinney_Crossing_Phase_2A_Final_Plans_November_6_2012.pdf  
Attached Document or FileAP_20-0025(2).pdf  
Attached Document or FileMaple_Tree_Place_2001_Progress_Plan_Set_70_Pages.pdf  
Attached Document or FileDP_10-35_Maple_Tree_Place_Approved_Master_Sign_Plan_10_11_2012.pdf  
Attached Document or FileDP_10-35_AMD_2_MTP_Civil_Set.pdf  
Attached Document or FileDP_10-35_AMD_2_MTP_Landscaping.pdf  
Attached Document or FileDP_10-35_AMD_2_MTP_Color_Final_Plans.pdf  
Attached Document or FileAP_20-0211.pdf  
Attached Document or FileDP_19-09_Final_Plans(1).pdf  
Attached Document or FileDP_20-03_UHaul_Signed_Final_Plans.pdf  
Attached Document or FileDP_17-01.3__17-01.4_Final_Plans.pdf  
Attached Document or FileFinney_Crossing_Commercial_Master_Sign_Plan.pdf  
Attached Document or FileDP_09-01.20_Final_MSP.pdf  
Attached Document or FileDP_16-05.1_Phase 1 amendment  
Attached Document or FileDP_16-05.2_phase 2 amendment  
Attached Document or FileDP_09_01.22_Finney_Building_E_Civil.pdf  
Attached Document or FileDP_09_01.22_Finney_Building_E_Architectural.pdf  
Attached Document or FileDP_09-01.22_Finney MSP.pdf  
Attached Document or File13-04.2_VTrams_Park_and_Ride_Signed_Final_Plans.pdf  
Attached Document or FileDP_18-06.1_Final_Plans_Civil(1).pdf  
Attached Document or FileDP_18-06.1_Final_Plans_Architectural(1).pdf  
Attached Document or FileDP_20-13_Signed_Final_Plans_April_18_2022.pdf  
Attached Document or FileThe Annex - 16a_Civil_Plan_Set_-_Site_Plans_and_Profiles.pdf  
Attached Document or FileThe Annex - 16b_Civil_Plan_Set_-_Details.pdf  
Attached Document or FileThe Annex - 16c_Civil_Plan_Set_-_Landscaping_Lighting_Maintenance.pdf  
Attached Document or FileThe Annex - 15_Architectural_Plans.pdf  
Attached Document or FileThe Annex - 03_Narrative_Cover_Letter_Phase_1_2022_0603.pdf  
Attached Document or FileThe_Annex_Land_Plan.pdf  
Attached Document or FileModular_Classroom_Plans_Allen_Brook_School_2002.pdf  
Attached Document or FileDP_21-19_Approved_Final_Plans.pdf  
Attached Document or File4626 Williston Road DP_22-06_Approved_Final_Plans.pdf  
Attached Document or FileDP_22-06_Architectural_Plans_and_Render_1(1).pdf  
Attached Document or FileDP_15-06_Signed_Final_Plans_Oct_24_2017(3).pdf  
Attached Document or File13-04.2_VTrans_Park_and_Ride_Signed_Final_Plans.pdf  
Attached Document or FileLot 2 U-Haul Expansion Final plans  
Attached Document or FileDP_21-05_Townhomes at Sallys Way.pdf  
Attached Document or FileDP_20-18.2_20-18.3_Approved_Final_Plans_July_2024.pdf  
Attached Document or FileDP_20-18.3_Minor_Amendment_to_Final_Plans_6-10-2025.pdf  
Attached Document or FileDP_24-06_Unapproved_Final_Plans_Civil_Set_10-30-2025.pdf  
 